EaJPmHpiicrqMRRPODCSzr • 268:8256
806 technologies control
https://www.figma.com/design/EaJPmHpiicrqMRRPODCSzr/806-Technologies---Control?node-id=268-8256&t=j297swZdsN4Ghnan-11
Preflight
Frame needs design cleanup before demo generation or dev handoff.
Blocked because score 68 is below the demo threshold 85; status is not-ready, but demo generation requires ready-to-go; 1 error issue(s) exceed the allowed maximum 0.
Current blocking structure issues make the demo path unreliable right now.
68/100
4/21/2026, 3:47:54 PM
Request fixes
Blocked
Blocked by strict gate
0
0
0
0
0
Design review lanes
Fix: Add wrap or a mobile stacking rule to these multi-item rows before handoff.
Fix: Treat this frame as fix-first until the export includes layout metadata, or re-run against a fuller scene dump before trusting the score.
- Homepage v2 [268:8256]
- Homepage v2 > Rectangle 13 [268:8257]
- Homepage v2 > office-workers-working-together-as-team 1 [268:8258]
- Homepage v2 > Frame 1597881491 [268:8259]
- Homepage v2 > Frame 1597881491 > Hero - v2 [268:8260]
- Homepage v2 > Frame 1597881491 > Hero - v2 > office-workers-working-together-as-team 1 [268:8261]
Fix: Rename the frame to the SOP format, for example: Projectname_Homepage_V1, Projectname_Homepage_V2, Projectname_About Us_V1.1.
- Homepage v2 [268:8256]
Score breakdown
Start 92 → end 68. Demo threshold 85; ready-to-go threshold 85.
No wrapping groups were detected, which increases responsive layout risk.
The scene export omitted layout definitions even though 226 nodes reference layout metadata, which weakens confidence in responsiveness and sizing checks.
Root frame naming is off-SOP ("Homepage v2"). Expected Project_Page_V1 or Project_Page_V1.1 style versioning.
Issues
Treat this frame as fix-first until the export includes layout metadata, or re-run against a fuller scene dump before trusting the score.
Evidence: Homepage v2 [268:8256], Homepage v2 > Rectangle 13 [268:8257], Homepage v2 > office-workers-working-together-as-team 1 [268:8258], Homepage v2 > Frame 1597881491 [268:8259], Homepage v2 > Frame 1597881491 > Hero - v2 [268:8260], Homepage v2 > Frame 1597881491 > Hero - v2 > office-workers-working-together-as-team 1 [268:8261]
Rename the frame to the SOP format, for example: Projectname_Homepage_V1, Projectname_Homepage_V2, Projectname_About Us_V1.1.
Evidence: Homepage v2 [268:8256]
Add wrap or a mobile stacking rule to these multi-item rows before handoff.
Actions
Strict gate first. Parser, scene cache, and operator actions should stay visible here, not hidden behind API trivia.
/app/data/scenes/806-technologies-control-268-8256.txt
65,537 bytes • updated 4/21/2026, 3:47:54 PM
This frame should stay in correction mode until the blocking design issues are fixed.
Current blocking structure issues make the demo path unreliable right now.
Standard publish stays locked until the frame clears the strict readiness gate.
Discord handoff block
Copy this directly into Discord or a dev handoff thread.
Links
/diagnostic/806-technologies-control-268-8256
Not generated yet.
/generic/806-technologies-control-268-8256
/ai-preview/806-technologies-control-268-8256
/compare/806-technologies-control-268-8256
Not published yet.
/data/openclaw/workspace-personal-assistant/reports/figma/eajpmhpiicrqmrrpodcszr-268-8256.md
/data/openclaw/workspace-personal-assistant/reports/figma/eajpmhpiicrqmrrpodcszr-268-8256.json
/app/data/scenes/806-technologies-control-268-8256.txt
Present • updated 4/21/2026, 3:47:54 PM
Discord flow
Target commands: check https://www.figma.com/design/EaJPmHpiicrqMRRPODCSzr/806-Technologies---Control?node-id=268-8256&t=j297swZdsN4Ghnan-11, recheck, go, publish, status.
Current rule: go/generate should open the standard preview route for a registered demo. If no dedicated implementation exists yet, preview uses the exact-frame path. Publish still requires the stricter gate and a dedicated implementation.